Axis Environmental Solutions provides certified, independent 3rd-party verification to ensure your building meets the requirements of the Florida Fire Prevention Code (FFPC), NFPA 1225, and IFC 510. We specialize in ERRCS Signal Grid Testing and RF Compliance to help you secure your CO without delays.
View Full ERRCS Testing Technical Procedures
ERRCS Grid Testing
Objective Verification for Life Safety
We provide comprehensive signal strength mapping to ensure first responder radios function flawlessly throughout your facility. Using industry-leading PCTEL instrumentation, we verify compliance with NFPA 1225 and Florida Fire Prevention Code standards, identifying any dead zones before your final inspection.
Process of Scheduling a Test, Pricing & Procedures and Reporting
Step 1 Contact US
Contact us by phone or email.
Office 561-855-4387 Field Number 561-313-3545
Step 2 Floor Plans
Send/Submit the floor plans of your building to be tested.
Step 3 Quote
We will provide a quote/pricing for your building. We have very competitive prices for local buildings.
Step 4 Proceeding with Services
If quote is approved, we will schedule the test day and require a 50% down payment.
Step 5 On-site Grid Testing
On-Site Grid Testing will be conducted using the industry’s leading technology
(PCTEL) instrumentation and software system for measuring Emergency
Responder Radio Coverage. We will require access to all areas of the building
which includes locked/secured equipment/electrical rooms housing FACP etc. and access to roof if possible.
Depending on the AHJ most common measurement requirements are of downlink
RSSI (Received Signal Strength Indicator), SINR (Signal to Interference Noise Ratio)
and FBER (Frame Bit Error Rate). Some AHJ’s may require Uplink Testing.
Step 6 Report
Once the on-site testing is completed the remaining 50% will be due and you will receive a certified report.